Tuesday, April 8, 2008

Pedestals Chines and Level Floors! April 5th and 6th

Hi all!! This past weekend I got some more great progress done on the boat. I spent quite a few hours sanding the chines down so that they flowed into the sides and bottom for painting. I also cleaned up and sanded the forward and aft level floors and prepped them for their final lamination. I assembled the aft pedestal and glued them up, as well as got the guide hoops ready to cut and glass. This week I will be meeting with my committee to talk future plans and get everyone up to speed on the school end of things. I also hope to have my level floors finished laminating and pedestals glassed by next weekend!
(Forward level floor with one side laminated)
(Sanded Chines)
(Aft pedestal with face plate installed and top setting on top)